New style of mineralization intersected in the hanging wall above the Sooy Vein in Drill Hole 21-231
HALIFAX, NS / ACCESSWIRE / July 13, 2021 / Silver Tiger Metals Inc. (TSXV:SLVR)(OTCQX:SLVTF) ("Silver Tiger" or the "Corporation") has intersected 2,063.3 g/t silver equivalent over 0.5 meters in the Sooy Vein hanging wall in Drill Hole ET-21-231 from 270.0 meters to 270.5 meters within a broader mineralized interval of 10.8 meters grading 368.6 g/t silver equivalent from 262.3 meters to 273.1 meters. This hole intersected the Sooy Vein on Section 4425N, approximately 475 meters to the south along strike from discovery hole ET-20-202 (see Silver Tiger press release dated Feb. 2, 2021). This mineralized zone, referred to as the crackle breccia zone, is located in the hanging wall above the Sooy Vein and is represented by pervasive silicification in the brecciated tuffs of the Flat Formation with both disseminated pyrite and stringers/veinlets of quartz-pyrite-galena-sphalerite and chalcopyrite.
Drill hole ET-21-231 also intersected the Sooy Vein deeper down hole returning 1.5 meters grading 749.4 g/t silver equivalent within a broader mineralized interval of 21.9 meters grading 179.7 g/t silver equivalent from 289.3 meters to 311.2 meters.
Highlights from the on-going drilling program include the following:
- Hole ET 21-231 (Sooy Vein Hanging Wall): 0.5 meters grading 2,063.3 g/t silver equivalent from 270.0 meters to 270.5 meters, consisting of 1,801.0 g/t silver, 0.35 g/t gold, 0.71% copper, 3.11% lead and 2.82% zinc, within 10.8 meters grading 368.6 g/t silver equivalent from 262.3 meters to 237.1 meters, consisting of 303.3 g/t silver, 0.11 g/t gold, 0.13% copper, 0.84% lead and 0.75% zinc.
- Hole ET-21-231 (Sooy Vein): 1.5 meters grading 749.4 g/t silver equivalent from 297.4 meters to 298.9 meters consisting of 534.0 g/t silver, 0.09 g/t gold, 0.20% copper, 2.41% lead and 3.98% zinc, within 21.9 meters grading 179.7 g/t silver equivalent from 289.3 meters to 311.2 meters consisting of 125.4 g/t silver, 0.17 g/t gold, 0.06% copper, 0.49% lead and 0.72% zinc.
- Hole ET-21-235 (Benjamin Vein - Northern Sooy): 1.0 meters grading 685.7 g/t silver equivalent from 140.4 meters to 141.4 meters consisting of 391.0 g/t silver, 0.13 g/t gold, 0.56% copper, 3.56% lead and 4.43% zinc, within 6.3 meters grading 161.2 g/t silver equivalent from 138.5 meters to 144.8 meters consisting of 89.0 g/t silver, 0.10 g/t gold, 0.12% copper, 0.76% lead and 1.07% zinc.
Additional results are presented in the Drill Hole Results table below along with the details for the calculation of the silver equivalent grades.
See attached El Tigre Cross Section 4425N detailing drill hole ET-21-231. A Plan Map of El Tigre Veins and Drill Holes is also attached.
Silver Tiger's CEO, Glenn Jessome, stated, "Large step outs like drill hole 231 on the Sooy Vein continue to deliver high grade silver intercepts and the discovery of the crackle breccia zone in the Sooy hanging wall is another important discovery at El Tigre." Glenn Jessome continued, "Strong high grade silver intercepts within wide mineralized breccia zones approximately 2 kilometers north of drill hole 231 in the Benjamin Vein, and to the south along the Sooy Vein, continue to delineate the high grade intensity and evolving width of the El Tigre mineralized system."
As previously reported, Discovery Drill Hole ET-20-202 intersected 11.75 meters grading 667.9 g/t silver equivalent within 22.2 meters grading 381.9 g/t silver equivalent approximately 12 meters beyond the footwall of the Sooy Vein (refer to Silver Tiger press release dated February 2, 2021).
Drill Hole Results Table
Hole ID | Comment | From | To | Length(1) | Gold | Silver | Copper | Lead | Zinc | AgEq Total (2) |
m | m | m | g/t | g/t | % | % | % | g/t | ||
ET-21-231 | Sooy Hanging Wall | 252.6 | 253.1 | 0.5 | 0.07 | 56.2 | 0.02 | 0.43 | 2.23 | 147.6 |
HW Crackle Breccia | 262.3 | 273.1 | 10.8 | 0.11 | 303.3 | 0.13 | 0.84 | 0.75 | 368.6 | |
including | 269.0 | 272.0 | 3.0 | 0.20 | 793.2 | 0.33 | 1.58 | 2.05 | 945.9 | |
including | 270.0 | 270.5 | 0.5 | 0.35 | 1,801.0 | 0.71 | 3.11 | 2.82 | 2,063.3 | |
and | 283.3 | 283.8 | 0.5 | 0.20 | 527.0 | 0.25 | 0.35 | 0.89 | 603.6 | |
Sooy Vein | 289.3 | 311.2 | 21.9 | 0.17 | 125.4 | 0.06 | 0.49 | 0.72 | 179.7 | |
including | 297.4 | 298.9 | 1.5 | 0.09 | 534.0 | 0.20 | 2.41 | 3.98 | 749.4 | |
ET-21-235 | Benjamin Vein | 138.5 | 144.8 | 6.3 | 0.10 | 89.0 | 0.12 | 0.76 | 1.07 | 161.2 |
including | 140.4 | 141.4 | 1.0 | 0.13 | 391.0 | 0.56 | 3.56 | 4.43 | 685.7 | |
ET-21-236 | Results pending | |||||||||
ET-21-237 | 80.4 | 82.9 | 2.5 | 0.03 | 117.2 | 0.05 | 0.20 | 0.03 | 129.4 | |
Benjamin Vein | 134.6 | 137.0 | 2.4 | 0.05 | 75.8 | 0.03 | 0.25 | 0.77 | 114.5 | |
Notes:
1. Not true width.
2. Silver Equivalent ("EqAg") ratios are based on a silver to gold price ratio of 75:1 (Au:Ag). Copper, lead and zinc are converted using $3.66/lb copper, $0.90/lb lead, $1.26/lb zinc at 100% metal recoveries based on a silver price of $26.00/oz.
Drill Hole Location Table
Hole ID | Section | Easting | Northing | Elevation | Az | Dip | Length |
ET-21-231 | 4425N | 670682 | 3384423 | 1952 | 88 | -50 | 414.8 |
ET-21-235 | 6050N | 670402 | 3386050 | 1912 | 90 | -52 | 195.2 |
ET-21-236 | 4930N | 670737 | 3384920 | 1961 | 90 | -56 | 396.5 |
ET-21-237 | 6050N | 670402 | 3386050 | 1912 | 90 | -40 | 164.7 |
El Tigre Cross Section 4425N
Plan Map of the El Tigre Veins and Drill Holes
El Tigre Resource Estimate
After acquiring El Tigre, Silver Tiger drilled 12,500 meters to define the wide halo of near surface gold mineralization around the mined high-grade veins of the historic El Tigre Mine. This allowed Silver Tiger to deliver a maiden resource estimate for the El Tigre Property to a depth of 150 meters containing indicated resources of 661,000 gold equivalent ounces at 0.77 g/t (21 g/t silver and 0.51 g/t gold) and inferred resources of 341,000 gold equivalent ounces at 1.59 g/t (88 g/t silver and 0.52 g/t gold). The National Instrument 43-101 Technical Report titled "NI 43-101 Technical Report and Updated Mineral Resource Estimate on the El Tigre Project, Sonora, México" effective as of September 7, 2017 and dated October 26, 2017 prepared by David Burga, P.Geo., Yungang Wu, P.Geo., Fred Brown, P.Geo., Jarita Barry, P.Geo., Eugene Puritch, P.Eng., FEC, CET, Alfred Hayden, P.Eng. and Richard H. Sutcliffe, Ph.D., P.Geo. of P&E Mining Consultants Inc. is available on the Corporation's website at www.silvertigermetals.com and on www.sedar.com under the Corporation's profile.
About the El Tigre Historic Mine District
Silver Tiger Metals Inc. is a Canadian company whose management has more than 25 years' experience discovering, financing and building large hydrothermal silver projects in Mexico. Silver Tiger's 100% owned 28,414 hectare Historic El Tigre Mining District is located in Sonora, Mexico. Principled environmental, social and governance practices are core priorities at Silver Tiger.
The El Tigre historic mine district is located in Sonora, Mexico and lies at the northern end of the Sierra Madre silver and gold belt which hosts many epithermal silver and gold deposits, including Dolores, Santa Elena and Las Chispas at the northern end. In 1896, gold was first discovered on the property in the Gold Hill area and mining started with the Brown Shaft in 1903. The focus soon changed to mining high-grade silver veins in the area with production coming from 3 parallel veins the El Tigre Vein, the Seitz Kelley Vein and the Sooy Vein. Underground mining on the middle El Tigre vein extended 1,450 meters along strike and was mined on 14 levels to a depth of approximately 450 meters. The Seitz Kelley Vein was mined along strike for 1 kilometer to a depth of approximately 200 meters. The Sooy Vein was only mined along strike for 250 meters to a depth of approximately 150 meters. Mining abruptly stopped on all 3 of these veins when the price of silver collapsed to less than 20¢ per ounce with the onset of the Great Depression. By the time the mine closed in 1930, it is reported to have produced a total of 353,000 ounces of gold and 67.4 million ounces of silver from 1.87 million tons (Craig, 2012). The average grade mined during this period was over 2 kilograms silver equivalent per ton.
The El Tigre silver and gold deposit is related to a series of high-grade epithermal veins controlled by a north-south trending structure cutting across the andesitic and rhyolitic tuffs of the Sierra Madre Volcanic Complex within a broad silver and gold mineralized prophylitic alteration zone developed in the El Tigre Formation that can be up to 150 meters wide. The veins dip steeply to the west and are typically 0.5 meter wide but locally can be up to 5 meters in width. The veins, structures and mineralized zones outcrop on surface and have been traced for 5.3 kilometers along strike in our brownfield exploration area. Historical mining and exploration activities focused on a 1.6 kilometer portion of the southern end of the deposits, principally on the El Tigre, Seitz Kelly and Sooy veins. The under explored Caleigh, Benjamin, Protectora and the Fundadora exposed veins continue north for more than 3 kilometers. Silver Tiger has delivered its maiden 43-101 compliant resource estimate and is currently drilling to update its resource estimate and publish a PEA.
VRIFY Slide Deck and 3D Presentation - Silver Tiger's El Tigre Project
VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.
Access the Silver Tiger Metals Inc. Company Profile on VRIFY at: https://vrify.com
The VRIFY Slide Deck and 3D Presentation for Silver Tiger Metals Inc. can be viewed at: https://vrify.com/explore/decks/492 and on the Corporation's website at: www.silvertigermetals.com.
Procedure, Quality Assurance / Quality Control and Data Verification
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work.
The sealed and tagged sample bags are transported to the Bureau Veritas facility in Hermosillo, Mexico. Bureau Veritas crushes the samples (Code PRP70-250) and prepares 200-300 gram pulp samples with ninety percent passing Tyler 200 mesh (Code PUL85). The pulps are assayed for gold using a 30-gram charge by fire assay (Code FA630) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code FA530). Silver and multi-element analysis is completed using total digestion (Code MA200 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code FA530).
Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed Silver Tiger's QA/QC protocols.
Qualified Person
David R. Duncan, P. Geo., V.P. Exploration of the Corporation, is the Qualified Person for Silver Tiger as defined under National Instrument 43-101. Mr. Duncan has reviewed and approved the scientific and technical information in this press release.
For further information, please contact:
Glenn Jessome
President and CEO
902 492 0298
jessome@silvertigermetals.com
CAUTIONARY STATEMENT:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This News Release includes certain "forward-looking statements". All statements other than statements of historical fact included in this release, including, without limitation, statements regarding potential mineralization, resources and reserves, the ability to convert inferred resources to indicated resources, the ability to complete future drilling programs and infill sampling, the ability to extend resource blocks, the similarity of mineralization at El Tigre to Delores, Santa Elena and Chispas, exploration results, and future plans and objectives of Silver Tiger, are forward-looking statements that involve various risks and uncertainties. Forward-looking statements are frequently characterized by words such as "may", "is expected to", "anticipates", "estimates", "intends", "plans", "projection", "could", "vision", "goals", "objective" and "outlook" and other similar words. Although Silver Tiger believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Silver Tiger's expectations include risks and uncertainties related to exploration, development, operations, commodity prices and global financial volatility, risk and uncertainties of operating in a foreign jurisdiction as well as additional risks described from time to time in the filings made by Silver Tiger with securities regulators.
SOURCE: Silver Tiger Metals Inc.
View source version on accesswire.com:
https://www.accesswire.com/655269/Silver-Tiger-Intersects-20633-GT-AgEq-Over-05-Meters-Within-a-Broader-Interval-of-108-Meters-Grading-3686-GT-AgEq-in-Drill-Hole-21231