Form 6-K
Table of Contents

 
 
United States
Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the
Securities Exchange Act of 1934
For the month of

October 2010
Vale S.A.
Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b). 82-                    .)
 
 

 


TABLE OF CONTENTS

Press Release
Signature Page


Table of Contents

(IMAGE)
Vale – 3Q10 Production Report
HIGH PERFORMANCE
Rio de Janeiro, October 18, 2010 – Vale S.A. (Vale) operations performed very well in 3Q10, as shown by the continuous output increase of the majority of its products, and the recording of all-time high volumes for pellets, coal and bauxite.
We concluded three projects – Additional 20Mt, Bayóvar and CSA – in the first seven months of the year and others are being delivered in 4Q10 – Onça Puma, Tres Valles and Oman. VNC, formerly Goro, is being successfully commissioned and has already started to produce an intermediate nickel and cobalt product, nickel hydroxide cake. A total of US$ 12.6 billion was invested in these projects, which are beginning to generate cash flow and superior returns to shareholders.
The improvement in operational performance of the existing assets and the delivery of new projects amidst a scenario of growing global demand for minerals, metals and fertilizers are adding significant strength to our financial results.
The production of iron ore reached 82.6 Mt1, the second largest quarterly output in Vale’s history and the best performance since the record of 85.8 Mt achieved in 3Q08. The operational issues at the discharge in the Ponta da Madeira maritime terminal were solved, allowing Carajás production to rise to a record level. In another important achievement, the performance of our iron ore operations was sufficient to feed the all-time high pellet output of 13.6 Mt in 3Q10.
In the first nine months of 2010, Vale produced 227.5 Mt of iron ore and 36.8 Mt of pellets, increasing 30.4% and 143.5%, respectively, over the same period last year.
Coal production attained a record level of 1.9 Mt in 3Q10 as did bauxite with 3.8 Mt.
The Canadian nickel operations were returning to normalcy during 3Q10 and are reaching full capacity in October. Mining as well as smelting and refining operations at Sudbury, the precious metals plant of Port Colborne, and Voisey’s Bay mining and processing operations were ramped up. The 3Q10 numbers already showed some improvement in nickel and copper output, but the bulk of output growth of nickel and its by-products will be reflected in the 4Q10 report.
In 3Q10, the first quarter in which their production volumes are reported for the full three-month period, the recently acquired phosphate fertilizer assets delivered a strong performance. Bayóvar, our phosphate rock mine in Peru, came on stream in July 2010, and its first production of 209,000 metric tons was recorded in 3Q10.
 
     
1  
Mt=million metric tons
 
   
kt=thousand metric tons
 
   
t=metric tons

 

1


Table of Contents

(IMAGE)
BULK MATERIALS
 
Iron ore
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
IRON ORE
    66,780       75,860       82,614       174,510       227,533       8.9 %     23.7 %     30.4 %
Southeastern System
    25,528       31,049       32,619       64,221       89,825       5.1 %     27.8 %     39.9 %
Itabira
    8,939       10,139       10,621       23,128       28,668       4.8 %     18.8 %     24.0 %
Mariana
    7,834       9,750       9,697       21,001       27,702       -0.5 %     23.8 %     31.9 %
Minas Centrais
    8,482       10,148       11,212       19,820       30,515       10.5 %     32.2 %     54.0 %
Corumbá
    n.a.       652       749       n.a.       1,953       14.8 %     n.a.       n.a.  
Urucum
    273       360       339       273       987       -5.8 %     24.3 %     261.5 %
Southern System
    15,684       19,808       20,258       40,643       56,489       2.3 %     29.2 %     39.0 %
Minas Itabiritos
    5,403       7,833       8,275       12,883       22,581       5.6 %     53.2 %     75.3 %
Vargem Grande
    5,697       5,821       5,938       15,344       16,938       2.0 %     4.2 %     10.4 %
Paraopeba
    4,584       6,154       6,044       12,415       16,970       -1.8 %     31.8 %     36.7 %
Carajás
    22,941       22,296       26,997       63,698       73,164       21.1 %     17.7 %     14.9 %
Samarco1
    2,628       2,707       2,741       5,948       8,054       1.2 %     4.3 %     35.4 %
     
1  
Vale’s attributable production capacity of 50%.
Our iron ore production rose to 82.6 Mt in 3Q10, which was the best performance since the all-time high level of 85.8 Mt of 3Q08. Output increased 8.9% on a quarter-on-quarter basis, primarily due to the outstanding performance of Carajás, which was responsible for 70% of the expansion.
When compared to the first nine months of last year, total iron ore production of 227.5 Mt increased by 30.4% in 2010.
The Southeastern System, which encompasses the Itabira, Mariana, Minas Centrais, Corumbá and Urucum mining sites, had a very good performance, reaching a production of 32.6 Mt, thus rising 5.1% over 2Q10 and 27.8% over 3Q09.
The Southern System – Minas Itabiritos, Vargem Grande and Paraopeba — produced 20.3 Mt in 3Q10, 2.3% above the figures for 2Q10. Production of 8.3 Mt from Itabiritos grew 5.6% and marked a new record. This was chiefly influenced by an additional processing plant beginning to operate in June.
At Carajás, iron ore output was 27.0 Mt in 3Q10 – a historical record — increasing 21.1% over 2Q10. The elimination of the operational problems at the discharge in the Ponta da Madeira maritime terminal was the main factor underlying the strong production growth. In addition, the improved performance of the Carajás railroad and the end of the rainy season in the Amazon region helped mining performance to excel.

 

2


Table of Contents

(IMAGE)
 
Pellets
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
PELLETS
    7,970       12,653       13,638       15,105       36,783       7.8 %     71.1 %     143.5 %
Tubarão I and II
    1,311       1,497       1,434       3,159       4,246       -4.3 %     9.3 %     34.4 %
Fábrica
    0       1,057       1,058       235       2,793       0.1 %     n.a.       n.a.  
São Luís
    0       1,440       1,656       3       3,391       15.1 %     n.a.       n.a.  
Vargem Grande
    809       1,441       1,425       1,034       4,113       -1.1 %     76.1 %     n.a.  
Nibrasco
    2,404       2,074       2,395       3,641       6,465       15.5 %     -0.3 %     77.6 %
Kobrasco
    0       1,198       1,163       889       3,547       -2.9 %     n.a.       299.1 %
Hispanobras1
    125       457       560       125       1,455       22.4 %     347.4 %     n.m.  
Itabrasco
    656       972       1,049       656       2,852       8.0 %     60.0 %     334.9 %
Samarco2
    2,665       2,519       2,897       5,364       7,920       15.0 %     8.7 %     47.7 %
     
1  
Vale’s attributable production capacity of 50.89%.
 
2  
Vale’s attributable production capacity of 50%.
In 3Q10, pellet production achieved the highest quarterly production figure ever, with 13.6 Mt, up 7.8% and 71.1% compared to 2Q10 and 3Q09, respectively.
The output of the Tubarão plants reflects the improved operational performance after the adjustments connected to the shutdown in 2008/2009. Five out of its seven plants recorded production increases. Itabrasco reached record production levels in 3Q10, at 1.0 Mt. Due to a three-day maintenance stoppage, Tubarão I and II showed a slight decrease in output, down to 1.4 Mt from 1.5 Mt in 2Q10.
The production of São Luís surged 15.1% on a quarter-on-quarter basis, given the augmented availability of feed from Carajás.
Vargem Grande, which came on stream in 1Q09 and has a nominal capacity of 7 Mtpy, is concluding its ramp up. In 9M10 it accumulated a production volume of 4.1Mt.
The three pellet plants of the 50%-owned JV Samarco, which have a nominal capacity of 21.0 Mtpy, are operating at full capacity and recording an all-time high output. Our attributable production was 2.897 Mt in 3Q10, increasing 15% over 2Q10.
In 3Q10, we produced 9.1 Mt of blast furnace pellets and 4.5 Mt of direct reduction pellets.
Currently, we are building two new pellet plants, Oman and Tubarão VIII, which will add 16.5 Mtpy to the company’s capacity. The Oman plant is planned to start up operations very soon, with total production capacity of 9 Mtpy of direct reduction pellets. In the week of October 11th, the vessel Ore Moatize, one of our iron ore carriers, left the Tubarão port for the Middle East with 147,000 metric tons of iron ore, the first iron ore shipment to feed the Oman pellet plant.

 

3


Table of Contents

(IMAGE)
 
Manganese ore and ferroalloys
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
MANGANESE ORE
    449       494       472       1,112       1,364       -4.4 %     5.1 %     22.7 %
Azul
    378       431       372       869       1,159       -13.7 %     -1.5 %     33.4 %
Urucum
    41       48       55       137       143       13.7 %     33.7 %     4.8 %
Other mines
    31       15       46       105       61       n.m.       48.4 %     -42.4 %
 
                                                               
FERROALLOYS
    59       113       112       135       335       -1.4 %     88.4 %     148.3 %
Brazil
    24       51       50       65       152       -2.3 %     110.7 %     133.4 %
Dunkerque
    10       36       35       10       103       -2.7 %     259.9 %     n.a.  
Mo I Rana
    26       26       26       60       80       2.3 %     2.2 %     33.9 %
In 3Q10, manganese ore production was slightly lower than the previous quarter, coming to 472,000 t against 494,000 tons in 2Q10.
This was caused by a stoppage of Azul — our largest manganese mine — for corrective maintenance, which meant a 13.7% reduction in its output relative to 2Q10. The production of Urucum grew by 13.7% over 2Q10 as a consequence of the adoption of an additional production shift.
Ferroalloy quarterly production was comprised of 55,000 t of ferrosilicon manganese alloys (FeSiMn), 52,000 t of high-carbon manganese alloys (FeMnHc) and 5,000 t of medium-carbon manganese alloys (FeMnMC).
 
Coal
                                                                         
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                                       
METALLURGICAL COAL
    844       755       814       1,869       2,285       7.9 %     -3.6 %             22.3 %
Integra Coal
    456       245       296       986       868       20.8 %     -35.1 %             -12.0 %
Broadlea
    114       70       0       227       101       n.m.       n.m.               -55.4 %
Carborough Downs
    127       277       289       359       849       4.2 %     n.m.               136.3 %
Others
    148       162       229       296       466       41.0 %     55.1 %             57.6 %
 
                                                                       
THERMAL COAL
    858       1,104       1,057       2,285       2,862       -4.2 %     23.3 %             25.2 %
El Hatillo
    315       809       830       775       2,161       2.6 %     163.7 %             178.9 %
Integra Coal
    147       65       114       599       236       74.3 %     -22.6 %             -60.5 %
Broadlea
    209       118       0       470       165       n.m.       -100.0 %             -64.8 %
Others
    187       111       113       442       299       1.4 %     -39.6 %             -32.4 %
In 3Q10 Vale’s coal production reached an all-time high volume of 1.9 Mt, which was comprised of 814,000 t of metallurgical coal and 1.1 Mt of thermal coal.

 

4


Table of Contents

(IMAGE)
Production of metallurgical and thermal coal at Integra Coal, in Australia, was 296,000 t and 114,000 t, respectively, in 3Q10. It has shown improved performance despite the unusual rainy weather during the Australian winter season, maintenance checks and equipment repair. Metallurgical coal output grew by 21% on quarter-on-quarter basis, while the production of thermal coal output increased 74.3% over 2Q10.
Production at Carborough Downs (CD), in Australia, was 289,000 t in 3Q10, versus 277,000 t in 2Q10. Production rates of the longwall have improved over the last quarter and are being achieved on a far more consistent basis, which allowed CD to achieve its best performance ever.
Broadlea, a small open pit mine, which had been used as an auxiliary source of output to CD while the longwall was being installed, was shut down in the first week of December 2009. Stockpiles of intermediate products existing at the end of 2009 were washed at the CD plant2 and used to produce coal in 2Q10. Broadlea continues to be in care and maintenance.
The thermal coal mine of El Hatillo, an open pit coal mine in Colombia, is ramping up and produced 830,000 t in 3Q10, up 2.6% on a quarter-on-quarter basis and 163.7% on a year-on-year.
BASE METALS
 
Nickel
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
NICKEL
    33       37       44       157       114       21.1 %     36.1 %     -27.4 %
Sudbury
    5       8       6       42       14       -20.0 %     25.4 %     -66.4 %
Thompson
    5       8       5       19       22       -43.2 %     4.1 %     12.5 %
Voisey Bay
    3       4       10       36       17       n.m.       n.m.       -53.0 %
Sorowako
    20       17       22       54       59       28.1 %     7.7 %     8.3 %
Others*
    0       0       2       6       3       n.m.       n.m.       -53.2 %
     
*  
External feed purchased from third parties and processed into finished nickel in our operations
Total finished nickel production was 44,000 t in 3Q10, 21% up on a quarter-on-quarter basis. In addition to the better performance of Sorowako, the output increase was due to the ramp up of Sudbury and Voisey’s Bay, which sourced an expansion of 4,700 t of finished nickel.
The handover of operating assets to workers returning after the long strike caused the stoppage of the Sudbury mines, the Clarabelle processing mill and the smelter for some time. Mines have largely been producing in line with the plan since September, and the smelter is now running with its two furnaces. The Copper Cliff Nickel Refinery (CCNR), which was shutdown during the strike, resumed operations near the end of August and reached full capacity by the end of September.
Therefore, while this transition helps to explain the relatively modest increase in nickel output in 3Q10, the dynamics of the ramp-up of the Canadian operations signal a major performance improvement for 4Q10.
Finished nickel production from Sudbury was 6,100 t, down 1,500 t from 2Q10, and up 25.4% from 3Q09.
Finished nickel production from Voisey’s Bay source nickel was 9,700 t, increasing 6,200 t over 2Q10. Voisey’s Bay nickel concentrates were used to feed CCNR and the Clydach nickel refinery.
Production at Thompson, in the province of Manitoba, Canada, was 4,700 t in 3Q10. This was 43.2% lower than the previous quarter due to the planned one-month annual maintenance shutdown in August.
 
     
2  
CHPP=coal handling and preparation plant

 

5


Table of Contents

(IMAGE)
Nickel in matte production from the Indonesian operations at Sorowako was 18,900 t in 3Q10, up 28.7% relative to 2Q10 due to strong performance.
The commissioning of VNC, the 60,000 t nickel project in New Caledonia, is almost concluded. The production cycle of its upstream units have begun and the resulting nickel solution from HPAL is being sold to clients as an intermediate nickel and cobalt product, nickel hydroxide cake (NHC).
The ramp up of Onça Puma, a 58,000 t ferronickel project in Brazil, is beginning in October and the first metal is expected to be delivered in November.
 
Copper
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
COPPER
    31       40       58       166       131       45.2 %     86.4 %     -20.7 %
Sossego
    31       29       32       89       87       10.9 %     3.3 %     -2.9 %
Sudbury
    0       3       14       39       20       n.m.       n.m.       -49.6 %
Thompson
    0       0       0       1       1       -74.7 %     -4.4 %     -44.2 %
Voisey’s Bay
    0       5       11       24       17       n.m.       n.m.       -28.4 %
Others
    0       3       1       12       7       -46.5 %     n.m.       -40.7 %
Vale’s copper production was 58,000 t in 3Q10, an increase of 45.2% on a quarter-on-quarter basis. Our Canadian operations delivered 26,000 t in 3Q10, 15,000 t higher than 2Q10.
With the end of the strike in Sudbury, the production of copper is expected to normalize in 4Q10.
Production of copper in concentrates from Sossego mine at Carajás was 3,100 t, 10.9% higher than 2Q10. This was caused by the increase of the utilization of SAG milling, a semi-autogenous mill that uses a large rotating drum filled with ore, water and steel grinding balls to transform the ore into a fine slurry.

 

6


Table of Contents

(IMAGE)
 
Nickel by-products
                                                                 
                                            % Change     % Change     % Change  
    3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
COBALT (metric tons)
    97       179       133       1,442       442       -25.4 %     37.0 %     -69.4 %
Sudbury
    2       6       39       359       45       n.m.       n.m.       -87.6 %
Thompson
    31       73       34       111       159       -53.8 %     9.1 %     43.3 %
Voisey Bay
    64       98       60       908       235       -38.7 %     -6.5 %     -74.1 %
Others
    1       2       1       64       3       n.m.       n.m.       -95.5 %
 
                                                               
PLATINUM (000’ oz troy)
    16       5       3       102       10       -45.2 %     -80.9 %     -90.5 %
Sudbury
    16       5       3       102       10       -45.2 %     -80.9 %     -90.5 %
 
                                                               
PALLADIUM (000’ oz troy)
    27       15       7       148       25       -49.8 %     -72.9 %     -82.9 %
Sudbury
    27       15       7       148       25       -49.8 %     -72.9 %     -82.9 %
 
                                                               
GOLD (000’ oz troy)
    4       6       5       47       15       -17.5 %     27.3 %     -68.5 %
Sudbury
    4       6       5       47       15       -17.5 %     27.3 %     -68.5 %
 
                                                               
SILVER (000’ oz troy)
    20       718       194       1,219       1,049       -72.9 %     884.4 %     -13.9 %
Sudbury
    20       718       194       1,219       1,049       -72.9 %     884.4 %     -13.9 %
In 3Q10, cobalt production was 133 metric tons, down 25.4% from 2Q10 due to the planned annual maintenance shutdown of Thompson.
The decrease in the production of platinum and palladium in 3Q10 still reflects the effects of the labor strike, given the long PGM production cycle. PGMs are processed through the Sudbury and Port Colborne plants and then shipped to the Acton refinery in the United Kingdom to be refined into finished products. Thus, the output of PGMs will be the last to recover from the interruption of Sudbury operations.
 
Bauxite
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
BAUXITE
    3,303       3,413       3,801       9,142       10,482       11.4 %     15.1 %     14.6 %
Trombetas
    1,600       1,568       1,883       4,520       4,975       20.1 %     17.7 %     10.1 %
Paragominas
    1,703       1,844       1,918       4,623       5,507       4.0 %     12.6 %     19.1 %
In 3Q10, Vale’s bauxite production reached a record of 3.8 Mt, showing an 11.4% quarter-on-quarter and a 15.1% year-on-year increase.
Vale’s attributable production at Trombetas amounted to 1.8 Mt, up 20.1% quarter-on-quarter and up 17.7% year-on-year, respectively.
The Paragominas bauxite mine hit an all time-high production of 1.9 Mt, rising 4% against 2Q10. In 3Q10, we concluded the ramp-up of the three additional filters, which will allow Paragominas to run at its nominal capacity of 9.9 Mtpy.

 

7


Table of Contents

(IMAGE)
 
Alumina
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
ALUMINA
    1,515       1,521       1,442       4,433       4,357       -5.2 %     -4.8 %     -1.7 %
Alunorte
    1,515       1,521       1,442       4,433       4,357       -5.2 %     -4.8 %     -1.7 %
The production of alumina at the Barcarena refinery totaled 1.4 Mt in 3Q10, as against 1.5 Mt in 2Q10, in line with its capacity.
 
Aluminum
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
ALUMINUM
    113       112       114       347       333       1.2 %     0.5 %     -4.1 %
Albrás
    113       112       114       338       333       1.2 %     0.5 %     -1.4 %
Valesul
    0                   9       0       n.a.       n.a.       n.a.  
Aluminum production was 114,000 t in 3Q10, against 112,000 t in 2Q10 and 113,000 t in 3Q09. The production on 3Q10 was in line with the quarterly and annual basis.
FERTILIZER NUTRIENTS
 
Potash
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
POTASH
    186       180       155       531       493       -13.9 %     -16.8 %     -7.2 %
Taquari-Vassouras
    186       180       155       531       493       -13.9 %     -16.8 %     -7.2 %
In 3Q10, production of potash was 155,000 t, a volume 25,000 t smaller than 2Q10. This is explained by the lower content of the feed and the corrective maintenance of the concentration and compression plant at Taquari-Vassouras.

 

8


Table of Contents

(IMAGE)
  Phosphates
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
Phosphate Rock
    1,145       1,107       1,407       3,423       3,468       27.1 %     22.8 %     1.3 %
Vale Fertilizantes
    711       685       721       2,225       2,011       5.2 %     1.3 %     -9.6 %
Vale Fosfatados
    434       421       477       1,197       1,248       13.2 %     9.9 %     4.2 %
Bayóvar
                209             209       n.a.       n.a.       n.a  
 
                                                               
MAP — Monoammonium phosphate
    207       185       229       664       653       24.1 %     10.6 %     -1.7 %
Vale Fertilizantes
    207       185       229       664       653       24.1 %     10.6 %     -1.7 %
 
                                                               
TSP — Triple superphosphate
    203       197       229       496       626       16.5 %     12.8 %     26.2 %
Vale Fertilizantes
    203       197       229       496       626       16.5 %     12.8 %     26.2 %
 
                                                               
SSP -Single superphosphate
    531       525       637       1,374       1,603       21.3 %     20.0 %     16.7 %
Vale Fosfatados
    531       525       637       1,374       1,603       21.3 %     20.0 %     16.7 %
 
                                                               
DCP – Dicalcium Phosphate
    138       137       144       352       390       5.0 %     4.6 %     10.8 %
Vale Fosfatados
    138       137       144       352       390       5.0 %     4.6 %     10.8 %
Vale Fosfatados owns two phosphate rock mines, Araxá, in the state of Minas Gerais, and Cajati, in the state of São Paulo, Brazil. Alongside the mining operations, the assets also comprise four processing plants for the production of phosphates fertilizers located at: (a) Araxá, state of Minas Gerais; (b) Cajati, state of São Paulo; (c) Cubatão, state of São Paulo; (d) Guará, state of São Paulo.
Total production of phosphate rock, which is used to feed the output of phosphate nutrients, rose 27.1% compared to 2Q10. Vale Fertilizantes, former Fosfertil, reached a production of 721,000 t, a 5.2% quarter-on-quarter increase. Vale Fosfatados production was up 13.2%, reaching 477,000 t, which was made possible by the ramp-up of plant 2.
Bayóvar, our Peruvian phosphate rock mine, started to ramp up production in July and produced 209,000 metric tons in 3Q10. Bayóvar is expected to be running at 1 Mtpy by yearend.
The production of MAP (monoammonium phosphate) was 229,000 t, up 24.1% quarter-on-quarter, recovering from the scheduled maintenance stoppages in the last quarter, and also increased 10.6% on an annual basis reflecting the higher demand.
TSP (triple superphosphate) production increased 16.5% compared to 2Q10 reaching the new record of 229,000 t in 3Q10.
In 3Q10, the production of SSP (single superphosphate) grew 21.3% mainly because of the additional shift in the Cubatão plant to meet the higher demand. The demand was also reflected in DCP (dicalcium phosphate) production which went up 5.0% on a quarter-on-quarter basis.

 

9


Table of Contents

(IMAGE)
  Nitrogen
                                                                 
                                            % Change     % Change     % Change  
000’ metric tons   3Q09     2Q10     3Q10     9M09     9M10     3Q10/2Q10     3Q10/3Q09     9M10/9M09  
 
                                                               
Ammonia
    129       112       108       381       368       -3.9 %     -16.4 %     -3.3 %
Vale Fertilizantes
    129       112       108       381       368       -3.9 %     -16.4 %     -3.3 %
 
                                                               
Urea
    125       144       77       368       365       -46.5 %     -38.2 %     -0.9 %
Vale Fertilizantes
    125       144       77       368       365       -46.5 %     -38.2 %     -0.9 %
 
                                                               
Nitric Acid
    119       103       119       337       334       15.3 %     -0.1 %     -1.1 %
Vale Fertilizantes
    119       103       119       337       334       15.3 %     -0.1 %     -1.1 %
 
                                                               
Ammonium Nitrate
    116       105       115       339       331       9.5 %     -0.6 %     -2.4 %
Vale Fertilizantes
    116       105       115       339       331       9.5 %     -0.6 %     -2.4 %
In 3Q10 ammonia production decreased 3.9% compared to 2Q10 due to the scheduled maintenance stoppage in the Araucária unit. This shutdown also impacted the urea production, which decreased 46.5% and 38.2% on a quarterly and annual basis, respectively.
The production of nitric acid and ammonium nitrate were 15.3% and 9.5% higher on a quarter-on-quarter basis, recovering from the scheduled maintenance in the Piaçaguera plant in 2Q10.
For further information. please contact:
+55-21-3814-4540
Roberto Castello Branco: roberto.castello.branco@vale.com
Viktor Moszkowicz: viktor.moszkowicz@vale.com
Carla Albano Miller: carla.albano@vale.com
Andrea Gutman: andrea.gutman@vale.com
Fernando Frey: fernando.frey@vale.com
Marcio Loures Penna: Marcio.penna@vale.com
Samantha Pons: samantha.pons@vale.com
Thomaz Freire: thomaz.freire@vale.com
This press release may include declarations about Vale’s expectations regarding future events or results. All declarations based upon future expectations. rather than historical facts. are subject to various risks and uncertainties. Vale cannot guarantee that such declarations will prove to be correct. These risks and uncertainties include factors related to the following: (a) the countries where Vale operates. mainly Brazil and Canada; (b) the global economy; (c) capital markets; (d) the mining and metals businesses and their dependence upon global industrial production. which is cyclical by nature; and (e) the high degree of global competition in the markets in which Vale operates. To obtain further information on factors that may give rise to results different from those forecast by Vale. please consult the reports filed with the Brazilian Comissão de Valores Mobiliários (CVM). the French Autorité des Marchés Financiers (AMF). and with the U.S. Securities and Exchange Commission (SEC). including Vale’s most recent Annual Report on Form 20F and its reports on Form 6K.

 

10


Table of Contents

Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
         
  Vale S.A.
(Registrant)
 
 
Date: October 18, 2010  By:   /s/ Roberto Castello Branco    
    Roberto Castello Branco   
    Director of Investor Relations