6-K
United States
Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the
Securities Exchange Act of 1934
For the month of
October 2008
Companhia Vale do Rio Doce
Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover of
Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this Form
is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If Yes is marked, indicate below the file number assigned to the registrant in connection with
Rule 12g3-2(b). 82-___.)
Vale 3Q08 Production Report
STRONG AND STEADY PERFORMANCE: NEW RECORDS
Rio de Janeiro, October 23, 2008 Companhia Vale do Rio Doce (Vale) achieved in the third quarter
of 2008 (3Q08) one of the best operational performances in its history, with eight records in
quarterly production: iron ore (85.9 million metric tons), pellets (12.2 million metric tons),
nickel (72,400 metric tons), bauxite (3.2 million metric tons), alumina (1.3 million metric tons),
aluminum (140,000 metric tons), cobalt (750 metric tons) and thermal coal (362,000 metric tons).
This performance derives from our consistent track record of delivering organic growth and
operational excellence. Given our wealth of world-class assets and financial strength, we are well
positioned to continue to invest and to exploit our competitive advantages.
In light of the risks posed by the current global economic environment, Vale retains the option to
manage the execution of its production program in accordance with market conditions.
FERROUS MINERALS
Ú Iron ore a new record quarter
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
IRON ORE |
|
|
80,170 |
|
|
|
78,050 |
|
|
|
85,884 |
|
|
|
223,065 |
|
|
|
238,422 |
|
|
|
10.0 |
% |
|
|
7.1 |
% |
|
|
6.9 |
% |
Southeastern System |
|
|
30,018 |
|
|
|
30,549 |
|
|
|
33,186 |
|
|
|
83,038 |
|
|
|
92,362 |
|
|
|
8.6 |
% |
|
|
10.6 |
% |
|
|
11.2 |
% |
Itabira |
|
|
12,082 |
|
|
|
11,682 |
|
|
|
11,553 |
|
|
|
34,911 |
|
|
|
34,100 |
|
|
|
-1.1 |
% |
|
|
-4.4 |
% |
|
|
-2.3 |
% |
Mariana |
|
|
8,548 |
|
|
|
8,987 |
|
|
|
10,501 |
|
|
|
23,628 |
|
|
|
28,497 |
|
|
|
16.9 |
% |
|
|
22.8 |
% |
|
|
20.6 |
% |
Minas Centrais |
|
|
9,388 |
|
|
|
9,880 |
|
|
|
11,132 |
|
|
|
24,499 |
|
|
|
29,765 |
|
|
|
12.7 |
% |
|
|
18.6 |
% |
|
|
21.5 |
% |
Southern System |
|
|
23,741 |
|
|
|
22,120 |
|
|
|
23,025 |
|
|
|
66,739 |
|
|
|
64,863 |
|
|
|
4.1 |
% |
|
|
-3.0 |
% |
|
|
-2.8 |
% |
MBR |
|
|
18,158 |
|
|
|
16,800 |
|
|
|
17,286 |
|
|
|
51,427 |
|
|
|
48,707 |
|
|
|
2.9 |
% |
|
|
-4.8 |
% |
|
|
-5.3 |
% |
Minas do Oeste |
|
|
5,583 |
|
|
|
5,320 |
|
|
|
5,739 |
|
|
|
15,311 |
|
|
|
16,156 |
|
|
|
7.9 |
% |
|
|
2.8 |
% |
|
|
5.5 |
% |
Carajás |
|
|
24,263 |
|
|
|
23,239 |
|
|
|
26,751 |
|
|
|
67,067 |
|
|
|
74,189 |
|
|
|
15.1 |
% |
|
|
10.3 |
% |
|
|
10.6 |
% |
Samarco1 |
|
|
1,863 |
|
|
|
1,855 |
|
|
|
2,633 |
|
|
|
5,360 |
|
|
|
6,262 |
|
|
|
41.9 |
% |
|
|
41.3 |
% |
|
|
16.8 |
% |
Urucum |
|
|
285 |
|
|
|
288 |
|
|
|
289 |
|
|
|
861 |
|
|
|
747 |
|
|
|
0.5 |
% |
|
|
1.5 |
% |
|
|
-13.3 |
% |
Iron ore production in 3Q08 was the highest in Vales history, amounting to 85.9 million metric
tons (Mt), up 7.1% compared to 80.2 Mt in 3Q07, including our attributable production at Samarco
a joint venture in which we own a 50% stake. Over the last twelve-month period ended on September
30, 2008 our iron ore output reached 318.5 Mt2.
In the first nine months of this year Vale produced 238.4 Mt, which is also a new record, being up
6.9% on 9M07. The additional 15.4 Mt was mainly due to the output increase at the Carajás, Brucutu
and Fazendão mines.
|
|
|
1 |
|
Production attributable to Vale |
|
2 |
|
310.4 Mt under US GAAP |
1
Carajás produced 26.8 Mt in 3Q08, running at an annualized output of 107 Mtpy. It was up 15.1%
relative to 2Q08, thus recovering from a performance negatively affected by heavy rains,
interruptions of railway traffic caused by protesters and restrictions in our logistics system.
Carajás production for the first nine months of 2008 was 74.2 Mt, an increase of 10.6% over 9M07.
The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais iron ore mines,
produced 33.2 Mt in 3Q08, 3.2 Mt more than the output of 3Q07. Production at Brucutu, which is part
of the Minas Centrais complex, reached 7.8 Mt in 3Q08. Production at Mariana increased 22.8%
year-over-year due to the ramp up of Fazendão, which produced 3.3 Mt in 3Q08.
The Southern System MBR and Minas do Oeste produced 23.0 Mt in 3Q08, 3.0% lower than the
figures for 3Q07, mainly due to lower production at the Mar Azul mine. Total production in 9M08 was
64.9 Mt, a slight reduction of 2.8% if compared to 9M07.
Ú Pellets an all-time high output
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
PELLETS1 |
|
|
10,900 |
|
|
|
11,158 |
|
|
|
12,238 |
|
|
|
31,691 |
|
|
|
33,751 |
|
|
|
9.7 |
% |
|
|
12.3 |
% |
|
|
6.5 |
% |
Tubarão I and II |
|
|
1,556 |
|
|
|
1,674 |
|
|
|
1,666 |
|
|
|
4,687 |
|
|
|
4,953 |
|
|
|
-0.5 |
% |
|
|
7.1 |
% |
|
|
5.7 |
% |
Fabrica |
|
|
1,048 |
|
|
|
1,030 |
|
|
|
1,091 |
|
|
|
3,031 |
|
|
|
3,200 |
|
|
|
6.0 |
% |
|
|
4.1 |
% |
|
|
5.6 |
% |
São Luís |
|
|
1,830 |
|
|
|
1,605 |
|
|
|
1,876 |
|
|
|
5,201 |
|
|
|
5,170 |
|
|
|
16.9 |
% |
|
|
2.5 |
% |
|
|
-0.6 |
% |
Nibrasco |
|
|
2,323 |
|
|
|
2,261 |
|
|
|
2,559 |
|
|
|
6,618 |
|
|
|
6,857 |
|
|
|
13.2 |
% |
|
|
10.2 |
% |
|
|
3.6 |
% |
Kobrasco |
|
|
1,228 |
|
|
|
1,256 |
|
|
|
1,281 |
|
|
|
3,689 |
|
|
|
3,810 |
|
|
|
2.0 |
% |
|
|
4.3 |
% |
|
|
3.3 |
% |
Hispanobras |
|
|
565 |
|
|
|
578 |
|
|
|
581 |
|
|
|
1,707 |
|
|
|
1,729 |
|
|
|
0.5 |
% |
|
|
2.8 |
% |
|
|
1.3 |
% |
Itabrasco |
|
|
492 |
|
|
|
453 |
|
|
|
531 |
|
|
|
1,532 |
|
|
|
1,498 |
|
|
|
17.0 |
% |
|
|
7.8 |
% |
|
|
-2.2 |
% |
Samarco |
|
|
1,860 |
|
|
|
2,301 |
|
|
|
2,654 |
|
|
|
5,226 |
|
|
|
6,534 |
|
|
|
15.3 |
% |
|
|
42.7 |
% |
|
|
25.0 |
% |
Vales attributable production of pellets, in which quantities produced by our joint ventures
Hispanobras, Itabrasco and Samarco are calculated in proportion to our stakes, reached 12.2 Mt in
3Q08, an all-time high, representing growth of 12.3 % over 3Q07.
We entered into a leasing contract for the Nibrasco and Kobrasco pelletizing operations in 2Q08. As
a consequence, their production is being consolidated 100% on a pro forma basis. We also entered
into a leasing contract for the Itabrasco operations as from 4Q08 onwards.
The part of Samarcos production, attributable to our stake, was 2.7 Mt of pellets in 3Q08,
compared to 1.8 Mt in 3Q07. Samarcos third pellet plant, which began operations in April, was the
main source of incremental production. The new plant contributed to the expansion of its nominal
capacity to 21.6 Mtpy from 14.0 Mtpy of pellets.
Our pellet plants had an outstanding performance in 3Q08, increasing their production compared with
3Q07. In 3Q08, 8.1 Mt of blast furnace pellets were produced and 4.1 Mt of direct reduction
pellets.
Total pellet volume produced in 9M08 amounted to 33.7 Mt, up 6.5% compared to 9M07.
|
|
|
1 |
|
Production attributable to Vale on a pro forma basis |
2
Ú Manganese ore and ferroalloys stoppage at Dunkerque
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
MANGANESE ORE |
|
|
100 |
|
|
|
658 |
|
|
|
694 |
|
|
|
1,215 |
|
|
|
1,892 |
|
|
|
5.4 |
% |
|
|
595.4 |
% |
|
|
55.7 |
% |
Azul |
|
|
10 |
|
|
|
546 |
|
|
|
561 |
|
|
|
899 |
|
|
|
1,611 |
|
|
|
2.8 |
% |
|
|
5716.2 |
% |
|
|
79.2 |
% |
Urucum |
|
|
83 |
|
|
|
77 |
|
|
|
75 |
|
|
|
206 |
|
|
|
188 |
|
|
|
-3.4 |
% |
|
|
-10.2 |
% |
|
|
-8.3 |
% |
Other mines |
|
|
7 |
|
|
|
35 |
|
|
|
58 |
|
|
|
111 |
|
|
|
93 |
|
|
|
n.m. |
|
|
|
729.6 |
% |
|
|
-16.5 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FERROALLOY |
|
|
130 |
|
|
|
128 |
|
|
|
130 |
|
|
|
405 |
|
|
|
391 |
|
|
|
1.9 |
% |
|
|
0.1 |
% |
|
|
-3.6 |
% |
Brazil |
|
|
70 |
|
|
|
75 |
|
|
|
78 |
|
|
|
208 |
|
|
|
229 |
|
|
|
3.8 |
% |
|
|
11.4 |
% |
|
|
9.9 |
% |
Dunkerque |
|
|
19 |
|
|
|
15 |
|
|
|
16 |
|
|
|
88 |
|
|
|
55 |
|
|
|
8.8 |
% |
|
|
-12.6 |
% |
|
|
-37.2 |
% |
Mo I Rana |
|
|
35 |
|
|
|
32 |
|
|
|
30 |
|
|
|
92 |
|
|
|
91 |
|
|
|
-6.8 |
% |
|
|
-14.7 |
% |
|
|
-1.5 |
% |
Urucum |
|
|
6 |
|
|
|
5 |
|
|
|
5 |
|
|
|
17 |
|
|
|
16 |
|
|
|
8.4 |
% |
|
|
-5.2 |
% |
|
|
-5.9 |
% |
Production of manganese ore amounted to 694,000 metric tons (t) in 3Q08, an increase of 5.4% in
comparison with the 658,000 t of 2Q08. It was well above the 100,000 t produced in the same quarter
last year, when the operations of Azul, our main manganese mine located at Carajás, were
temporarily suspended.
In the first nine months of this year we produced 1.892 million metric tons, an increase of 55.7%
over the same period last year.
In 3Q08, our ferroalloy production reached 130,000 t, an increase of 1.9% over 2Q08, attaining the
same levels as 3Q07. Our Dunkerque operations, located in France, were interrupted in August due to
problems with the electric furnace. We estimate that the furnace shutdown will mean a drop in
ferroalloy production of 45,000 t as operations are expected to resume only in 1Q09.
Our ferroalloy production was comprised of 58,800 t of ferrosilicon manganese alloys (FeSiMn),
58,500 t of high-carbon manganese alloys (FeMnAc) and 13,100 t of medium-carbon manganese alloys
(FeMnMC).
3
NON-FERROUS MINERALS
Ú Nickel continuous improvement
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
NICKEL1 |
|
|
55.1 |
|
|
|
69.0 |
|
|
|
72.4 |
|
|
|
179.0 |
|
|
|
202.2 |
|
|
|
4.9 |
% |
|
|
31.5 |
% |
|
|
13.0 |
% |
Sudbury |
|
|
14.6 |
|
|
|
20.4 |
|
|
|
18.4 |
|
|
|
53.9 |
|
|
|
56.4 |
|
|
|
-9.8 |
% |
|
|
26.0 |
% |
|
|
4.8 |
% |
Thompson |
|
|
5.6 |
|
|
|
7.0 |
|
|
|
7.6 |
|
|
|
21.4 |
|
|
|
21.4 |
|
|
|
8.5 |
% |
|
|
35.0 |
% |
|
|
-0.3 |
% |
Voiseys Bay |
|
|
12.3 |
|
|
|
18.2 |
|
|
|
21.9 |
|
|
|
38.4 |
|
|
|
58.3 |
|
|
|
19.9 |
% |
|
|
78.6 |
% |
|
|
51.8 |
% |
Sorowako |
|
|
17.7 |
|
|
|
19.4 |
|
|
|
19.1 |
|
|
|
55.2 |
|
|
|
53.7 |
|
|
|
-1.3 |
% |
|
|
8.0 |
% |
|
|
-2.6 |
% |
Others* |
|
|
4.8 |
|
|
|
4.0 |
|
|
|
5.4 |
|
|
|
10.0 |
|
|
|
12.3 |
|
|
|
34.4 |
% |
|
|
10.8 |
% |
|
|
22.7 |
% |
|
|
|
* |
|
External feed purchased from third parties and processed into finished nickel in our
operations |
Our finished nickel output amounted to 72,400 t in 3Q08, creating another historical record for
Vale for a single quarter. It was up 4.9% over the previous record, reached in 2Q08, of 69,000 t,
and 31.5% above 3Q07. Production for the first nine months of this year totaled 202,200 t, rising
13.0% compared to 9M07.
The rising nickel production is explained by a significant improvement in asset performance, which
is due to our efforts to upgrade existing assets.
Sudbury, located in the Canadian province of Ontario, produced 18,400 t in 3Q08, down 2,000 t
compared to 2Q08, but 3,800 t higher than the output for the same period last year. The reduction
verified on a quarter-over-quarter basis, was due to mechanical issues at the Clydach
refinery2, in Wales, and seismic events in the mines. This was partially offset by
higher production of third party feed, which is reflected in the 1,400 t increase in production
from others.
Our Thompson operation in Manitoba, Canada, contributed 7,600 t to our total production, up 8.5% in
relation to 2Q08, as full production has been resumed after issues with the smelter reverting
delivery systems and the power distribution system to the mines in 2Q08.
Our operations in Voisey Bay, in the province of Newfoundland and Labrador, Canada, have been
performing extremely well. 3Q08 was another record-breaking quarter, with an output of 21,900 t,
reflecting an increase in mined ore grade.
Vale produces nickel matte in Sorowako, on the island of Sulawesi, Indonesia, where we run the
largest lateritic nickel operation in the world. Finished nickel production amounted to 19,100 t in
3Q08, slightly below the 19,400 t reached last quarter. The start-up of our utility plant in
Dalian, China, allowed us to normalize our production in 2Q08. Dalian has a nominal capacity to
produce 35,000 mt of nickel and in the future will be dedicated to processing nickel oxide from
Goro.
|
|
|
1 |
|
The figures shown for finished nickel production do not
include the quantities produced from nickel concentrates purchased from other
companies and processed externally under tolling arrangements. These volumes
were 3.0 Kt in 3Q07, 1.7 Kt in 2Q08 and 1.4 Kt in 3Q08. |
|
2 |
|
Clydach refines part of the Sudbury feed.
Figures for our operations at Sudbury and Thompson include only the
production from feed originating from our own mines. It excludes any
concentrates purchased from third parties, which are subsequently processed in
our operations. |
4
Ú Bauxite Paragominas II ramping up
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
BAUXITE |
|
|
2,586 |
|
|
|
2,426 |
|
|
|
3,198 |
|
|
|
6,445 |
|
|
|
8,087 |
|
|
|
31.8 |
% |
|
|
23.7 |
% |
|
|
25.5 |
% |
Trombetas1 |
|
|
1,867 |
|
|
|
1,725 |
|
|
|
1,883 |
|
|
|
5,374 |
|
|
|
5,245 |
|
|
|
9.1 |
% |
|
|
0.8 |
% |
|
|
-2.4 |
% |
Paragominas |
|
|
719 |
|
|
|
701 |
|
|
|
1,316 |
|
|
|
1,071 |
|
|
|
2,842 |
|
|
|
87.6 |
% |
|
|
82.9 |
% |
|
|
165.2 |
% |
In 3Q08 our bauxite production reached a new record of 3.2 Mt, an increase of 23.7% compared with
2.6 Mt in 3Q07. Vale`s attributable production at Trombetas set a new record, of 1.9 Mt
Operations at the Paragominas mine, in the Brazilian state of Pará, produced 1.3 Mt in 3Q08, as the
second phase of Paragominas (Paragominas II) began ramping up in May adding 4.5 Mtpy to the nominal
capacity of Paragominas.
Paragominas mine is linked to the alumina refinery by the first bauxite pipeline in the world.
Ú Alumina ramping up of stages 6 & 7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
ALUMINA |
|
|
1,123 |
|
|
|
1,063 |
|
|
|
1,309 |
|
|
|
3,096 |
|
|
|
3,431 |
|
|
|
23.1 |
% |
|
|
16.5 |
% |
|
|
10.8 |
% |
Alunorte |
|
|
1,123 |
|
|
|
1,063 |
|
|
|
1,309 |
|
|
|
3,096 |
|
|
|
3,431 |
|
|
|
23.1 |
% |
|
|
16.5 |
% |
|
|
10.8 |
% |
The ramp up of Paragominas II enabled Vale to produce 1.3 Mt in 3Q08, up 16.5% against 3Q07,
setting a new output record.
Stages 6 and 7 of the Barcarena refinery started ramping up in June and July 2008, respectively,
augmenting its nominal capacity to 6.26 million metric tons per year.
Ú Aluminum a quarterly record
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
ALUMINUM |
|
|
138 |
|
|
|
136 |
|
|
|
140 |
|
|
|
412 |
|
|
|
407 |
|
|
|
2.9 |
% |
|
|
1.2 |
% |
|
|
-1.1 |
% |
Albras |
|
|
115 |
|
|
|
113 |
|
|
|
115 |
|
|
|
341 |
|
|
|
340 |
|
|
|
1.5 |
% |
|
|
0.4 |
% |
|
|
-0.2 |
% |
Valesul |
|
|
23 |
|
|
|
22 |
|
|
|
25 |
|
|
|
71 |
|
|
|
67 |
|
|
|
10.2 |
% |
|
|
4.8 |
% |
|
|
-5.4 |
% |
In 3Q08, production of primary aluminum was 140,000 t, an increase of 1.2% relative to 3Q07, due to
the improved performance of our two smelters. Production at Albras, in Barcarena, state of Pará,
was 115,000 t, and at Valesul, in Rio de Janeiro, 25,000 t.
In 9M08 production totaled 407,000 t, against 412,000 t in the same period a year earlier, due to
the reduction in Valesuls output program to minimize the exposure to the high volatility of energy
spot prices. Albras energy consumption is fully supplied under a 20-year contract, which expires
only in 2024.
|
|
|
1 |
|
Production attributable to Vale |
5
Ú Copper production increases by 23.2%
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
COPPER |
|
|
65.1 |
|
|
|
76.5 |
|
|
|
80.2 |
|
|
|
210.4 |
|
|
|
230.0 |
|
|
|
4.9 |
% |
|
|
23.2 |
% |
|
|
9.3 |
% |
Sossego |
|
|
26.9 |
|
|
|
30.3 |
|
|
|
32.8 |
|
|
|
86.0 |
|
|
|
93.3 |
|
|
|
8.5 |
% |
|
|
22.1 |
% |
|
|
8.5 |
% |
Sudbury |
|
|
23.9 |
|
|
|
29.0 |
|
|
|
30.8 |
|
|
|
84.0 |
|
|
|
87.3 |
|
|
|
6.3 |
% |
|
|
28.6 |
% |
|
|
4.0 |
% |
Thompson |
|
|
0.3 |
|
|
|
0.5 |
|
|
|
0.3 |
|
|
|
1.0 |
|
|
|
1.1 |
|
|
|
-43.1 |
% |
|
|
11.6 |
% |
|
|
14.2 |
% |
Voiseys Bay |
|
|
11.5 |
|
|
|
12.7 |
|
|
|
13.2 |
|
|
|
31.8 |
|
|
|
39.3 |
|
|
|
3.8 |
% |
|
|
15.3 |
% |
|
|
23.6 |
% |
Others |
|
|
2.2 |
|
|
|
4.0 |
|
|
|
3.0 |
|
|
|
7.5 |
|
|
|
8.9 |
|
|
|
-23.5 |
% |
|
|
37.7 |
% |
|
|
19.7 |
% |
Vales copper production totaled 80,200 t in 3Q08, up 23.2% compared to the same period a year
earlier.
The Canadian operations were responsible for approximately 55% of Vales total production this
quarter, adding 44,300 t to our total production. This meant an increase of 8,600 t over 3Q07,
driven by higher copper grades of mined ores.
Copper production in Sossego, at Carajás, was 32,800 t in 3Q08, increasing 22.1% against 26,900 t
in 3Q07 when there was a maintenance stoppage at the processing plant.
Vale produces copper concentrates at Sossego, Brazil, and copper concentrates, anodes and cathodes
at its operations in Canada, where copper is extracted as a by-product of nickel. The figures shown
in this report refer to the volumes of copper contained in these products.
Ú Nickel by-products higher cobalt grade
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
|
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
COBALT (metric tons) |
|
|
668 |
|
|
|
671 |
|
|
|
750 |
|
|
|
1,844 |
|
|
|
2,036 |
|
|
|
11.8 |
% |
|
|
12.3 |
% |
|
|
10.4 |
% |
Sudbury |
|
|
163 |
|
|
|
158 |
|
|
|
210 |
|
|
|
601 |
|
|
|
511 |
|
|
|
32.5 |
% |
|
|
28.6 |
% |
|
|
-14.9 |
% |
Thompson |
|
|
24 |
|
|
|
50 |
|
|
|
44 |
|
|
|
133 |
|
|
|
146 |
|
|
|
-11.8 |
% |
|
|
83.8 |
% |
|
|
9.9 |
% |
Voiseys Bay |
|
|
257 |
|
|
|
400 |
|
|
|
447 |
|
|
|
808 |
|
|
|
1,226 |
|
|
|
11.6 |
% |
|
|
73.9 |
% |
|
|
51.7 |
% |
Others |
|
|
225 |
|
|
|
63 |
|
|
|
50 |
|
|
|
303 |
|
|
|
153 |
|
|
|
-20.4 |
% |
|
|
-77.7 |
% |
|
|
-49.3 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PLATINUM (000oz troy) |
|
|
43 |
|
|
|
43 |
|
|
|
44 |
|
|
|
111 |
|
|
|
123 |
|
|
|
2.1 |
% |
|
|
2.6 |
% |
|
|
11.2 |
% |
Sudbury |
|
|
43 |
|
|
|
43 |
|
|
|
44 |
|
|
|
111 |
|
|
|
123 |
|
|
|
2.1 |
% |
|
|
2.6 |
% |
|
|
11.2 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PALLADIUM (000oz troy) |
|
|
52 |
|
|
|
54 |
|
|
|
66 |
|
|
|
152 |
|
|
|
169 |
|
|
|
22.6 |
% |
|
|
27.7 |
% |
|
|
11.2 |
% |
Sudbury |
|
|
52 |
|
|
|
54 |
|
|
|
66 |
|
|
|
152 |
|
|
|
169 |
|
|
|
22.6 |
% |
|
|
27.7 |
% |
|
|
11.2 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GOLD (000 oz troy) |
|
|
22 |
|
|
|
19 |
|
|
|
24 |
|
|
|
61 |
|
|
|
65 |
|
|
|
28.2 |
% |
|
|
9.8 |
% |
|
|
6.5 |
% |
Sudbury |
|
|
22 |
|
|
|
19 |
|
|
|
24 |
|
|
|
61 |
|
|
|
65 |
|
|
|
28.2 |
% |
|
|
9.8 |
% |
|
|
6.5 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SILVER (000 oz troy) |
|
|
605 |
|
|
|
578 |
|
|
|
650 |
|
|
|
1,676 |
|
|
|
1,734 |
|
|
|
12.4 |
% |
|
|
7.4 |
% |
|
|
3.4 |
% |
Sudbury |
|
|
605 |
|
|
|
578 |
|
|
|
650 |
|
|
|
1,676 |
|
|
|
1,734 |
|
|
|
12.4 |
% |
|
|
7.4 |
% |
|
|
3.4 |
% |
The production for all nickel by-products increased in 3Q08 relative to both 2Q08 and 3Q07.
In this quarter, cobalt production was 750 metric tons, a 12.3% increase against 3Q07, mainly due
to higher cobalt grade in the ore mined at Voiseys Bay as well as higher production achieved at
Sudbury and Manitoba.
6
Ú Potash operational challenges
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
POTASH |
|
|
180 |
|
|
|
167 |
|
|
|
172 |
|
|
|
499 |
|
|
|
505 |
|
|
|
2.7 |
% |
|
|
-4.7 |
% |
|
|
1.2 |
% |
Taquari-Vassouras |
|
|
180 |
|
|
|
167 |
|
|
|
172 |
|
|
|
499 |
|
|
|
505 |
|
|
|
2.7 |
% |
|
|
-4.7 |
% |
|
|
1.2 |
% |
Production at Taquari-Vassouras in 3Q08 was 172,000 t, 4.7% below the level recorded for the same
period last year, as a consequence of problems with mining equipment.
In the first nine months of the year volume produced was 505,000 t, up 1.2% on production in 9M07,
as we have been mining higher-grade ores since 1Q08.
Ú Kaolin adjusting to market conditions
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
KAOLIN |
|
|
356 |
|
|
|
288 |
|
|
|
314 |
|
|
|
975 |
|
|
|
898 |
|
|
|
9.1 |
% |
|
|
-11.8 |
% |
|
|
-7.9 |
% |
PPSA |
|
|
178 |
|
|
|
153 |
|
|
|
136 |
|
|
|
454 |
|
|
|
429 |
|
|
|
-11.0 |
% |
|
|
-23.7 |
% |
|
|
-5.6 |
% |
Cadam |
|
|
177 |
|
|
|
135 |
|
|
|
178 |
|
|
|
521 |
|
|
|
470 |
|
|
|
31.8 |
% |
|
|
0.1 |
% |
|
|
-9.8 |
% |
In 3Q08, kaolin production reached 314,000 t, decreasing 11.8% in relation to 3Q07 production of
356,000 t.
PPSA produced 136,000 t, down 23.7% over 3Q07 and 11.0% against 2Q08, in a move to adjust to weaker
demand. On the other hand, CADAM production was 178,000 t, in line with the same period a year
earlier.
In the first nine months of the year, Vales total kaolin production was 898,000 t, down 7.9%
compared to 9M07.
7
COAL
Ú Coal record thermal coal production
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
%change |
|
%change |
|
%change |
000 metric tons |
|
3Q07 |
|
2Q08 |
|
3Q08 |
|
9M07 |
|
9M08 |
|
3Q08/2Q08 |
|
3Q08/3Q07 |
|
9M08/9M07 |
METALLURGICAL COAL |
|
|
653 |
|
|
|
768 |
|
|
|
686 |
|
|
|
1,006 |
|
|
|
2,104 |
|
|
|
-10.6 |
% |
|
|
5.1 |
% |
|
|
n.m. |
|
Integra Coal |
|
|
416 |
|
|
|
409 |
|
|
|
448 |
|
|
|
666 |
|
|
|
1,307 |
|
|
|
9.5 |
% |
|
|
7.8 |
% |
|
|
n.m. |
|
Carborough Downs |
|
|
118 |
|
|
|
134 |
|
|
|
76 |
|
|
|
168 |
|
|
|
304 |
|
|
|
-43.4 |
% |
|
|
-35.6 |
% |
|
|
n.m. |
|
Broadlea |
|
|
0 |
|
|
|
93 |
|
|
|
60 |
|
|
|
26 |
|
|
|
204 |
|
|
|
-35.6 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Other |
|
|
120 |
|
|
|
132 |
|
|
|
103 |
|
|
|
146 |
|
|
|
290 |
|
|
|
-22.0 |
% |
|
|
-14.3 |
% |
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THERMAL COAL |
|
|
140 |
|
|
|
314 |
|
|
|
362 |
|
|
|
220 |
|
|
|
899 |
|
|
|
15.2 |
% |
|
|
158.8 |
% |
|
|
n.m. |
|
Integra Coal |
|
|
93 |
|
|
|
104 |
|
|
|
116 |
|
|
|
137 |
|
|
|
373 |
|
|
|
11.3 |
% |
|
|
25.3 |
% |
|
|
n.m. |
|
Broadlea |
|
|
0 |
|
|
|
168 |
|
|
|
209 |
|
|
|
12 |
|
|
|
432 |
|
|
|
24.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Other |
|
|
47 |
|
|
|
41 |
|
|
|
37 |
|
|
|
70 |
|
|
|
94 |
|
|
|
-11.1 |
% |
|
|
-22.0 |
% |
|
|
n.m. |
|
Our coal production in 3Q08 reached 1.048 Mt, of which 686,000 t was metallurgical coal and 362,000
t thermal coal.
Most of our coal production 53.8% of the Vales total comes from Integra Coal in the Hunter
Valley, in the state of New South Wales, Australia, where production was impacted by a routine
underground longwall move.
Production of coal at Carborough Downs totaled 76,000 t in 3Q08, a decrease compared with 2Q08,
when production was 134,000 t. The performance of Carborough Downs was negatively impacted by a
delay in the delivery of new mining equipment and construction work required for its expansion.
This project will increase its nominal capacity to 4.8 Mtpy by 2011, from a current capacity of 1.0
Mtpy.
Coal produced by the Broadlea and Carborough Downs mines is transported along the Goonyella
logistics corridor, which links the mines of the Central Queensland Bowen Basin to the Dalrymple
Bay coal terminal. Broadlea, which shares the same coal handling preparation plant (CHPP) with
Carborough Downs, had a very good performance during 3Q08 achieving a total production of 269,000
t. In July, a second fleet of equipment was shipped to the mine to compensate for the expected
lower Carborough Downs production.
8
For further information, please contact:
+55-21-3814-4540
Roberto Castello Branco: roberto.castello.branco@vale.com
Alessandra Gadelha: alessandra.gadelha@vale.com
Marcus Thieme: marcus.thieme@vale.com
Patrícia Calazans: patrícia.calazans@vale.com
Theo Penedo: theo.penedo@vale.com
Tacio Neto: tacio.neto@vale.com
This press release may include declarations that present Vales expectations in relation to future
events or results. All declarations, when based upon future expectations and not on historical
facts involve various risks and uncertainties. Vale cannot guarantee that such declarations will
come to be correct. These risks and uncertainties include factors related to the following: (a)
countries where we operate, mainly Brazil and Canada; (b) global economy; (c) capital markets; (d)
iron ore and nickel businesses and their dependence upon the global steel industry, which is
cyclical by nature; (e) factors of high degree of global competition in the markets which Vale
operates. To obtain further information on factors that may give origin to results different from
those forecasted by Vale, please consult the reports filed with the Brazilian Securities and
Exchange Commission (CVM), the Autorité des Marchés Financiers (AMF), and with the U.S. Securities
and Exchange Commission (SEC), including the most recent Annual Report Vale Form 20F and 6K
forms.
9
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
COMPANHIA VALE DO RIO DOCE
(Registrant)
|
|
Date: October 23, 2008 |
By: |
/s/ Roberto Castello Branco
|
|
|
|
Roberto Castello Branco |
|
|
|
Director of Investor Relations |
|
|